|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
body off frame and showing some rust needing repair |
|
|
|
underneath view of body showing rust holes that will be repaired |
|
|
|
outside view of rust that will be repaired |
|
|
|
some rust issues on body that will be repaired |
|
|
|
cross member and e-brake location |
|
|
|
|
front of frame before being disassembled |
|
|
|
mount on frame(this has to be taped before powder coating) |
|
|
|
lines and e-brake cable before being removed |
|
|
|
gas tank before removed |
|
|
|
rear of frame before we removed the gas tank and rear end |
|
|
|
|
junction for the lines before they were removed |
|
|
|
front of frame with p/s assist cylinder and lines before they were removed |
|
|
|
getting down to bare frame |
|
|
|
|
rear exhaust hanger area |
|
|
|
|
porting and polishing heads |
|
|
|
porting and plishing the heads |
|
|
|
Porting and polishing the heads |
|
|
|
rust in original fender |
|
|
|
rust in original fender |
|
|
|
|
|
|
|
|
|
|
laying out the powder coated items in relation to where they need installed |
|
|
|
Laying out all powder coated items to re-assemble |
|
|
|
Everything back from LXCustom Powder Coaters |
|
|
|
Got the frame and essentials back from LX Custom Powder Coating in New Lexington, OH |
|
|
|
rear axle painted with brakes going on |
|
|
|
|
Brakes installed on rear axle |
|
|
|
Painted Axle and brakes installed |
|
|
|
firewall painted |
|
|
|
motor and trans on chassis |
|
|
|
motor rebuilt and read to be placed on chassis |
|
|
|
|
motor and transmission on Chassis |
|
|
|
Dash ready to install |
|
|
|
|
right front view finished |
|
|
|
rear right qtr trim completed |
|
|
|
|
front seats finished |
|
|
|
rear seats completed |
|
|
|
right front finished |
|
|
|
engine compartment finished |
|
|
|
completed view of rear |
|
|
|
|
prep area for vinyl roof installation |
|
|
|
vinyl top finished |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|